METHOD STATEMENT PACKAGE — FLOOD MITIGATION

Total method statements: 51
Total editable Microsoft Word files: 102 (51 English + 51 Bahasa Malaysia)

IMPORTANT
Every template must be reviewed and adapted by a competent project team against the contract, approved drawings, project specification, actual site conditions, approved materials, manufacturer instructions, applicable Malaysian legal requirements and the Consultant's submission procedure before use.

CONTENTS
MS-CST-003 — Earth Excavation
MS-CST-004 — Filling and Compaction
MS-INF-001 — Road Subbase and Roadbase
MS-INF-002 — Asphalt Pavement
MS-INF-003 — Kerb and Channel
MS-INF-004 — Surface Drainage
MS-INF-005 — Sewer Pipeline
MS-INF-006 — Water Reticulation
MS-INF-007 — Street Lighting and External Cabling
MS-INF-008 — Soft Landscape Works
MS-SAF-001 — Mobilisation, Hoarding and Site Facilities
MS-SAF-002 — Scaffold Erection and Dismantling
MS-SAF-003 — Crane Lifting Operations
MS-SAF-004 — Confined Space Work
MS-SAF-005 — Hot Work
MS-SAF-006 — Temporary Dewatering
MS-SAF-007 — Controlled Demolition
MS-PBG-003 — Diaphragm Wall Construction
MS-PBG-005 — Soil Nailing and Slope Stabilisation
MS-BRI-001 — Bridge Pile Cap Construction
MS-BRI-002 — Bridge Pier and Pier Head
MS-BRI-003 — Precast Bridge Beam Erection
MS-BRI-004 — Bridge Deck Slab
MS-BRI-005 — Bridge Bearings and Expansion Joints
MS-HWY-001 — Highway Embankment Construction
MS-HWY-002 — Subgrade Preparation and Stabilisation
MS-HWY-003 — Cement-Treated Base Construction
MS-HWY-004 — Asphalt Milling and Resurfacing
MS-HWY-005 — Prime Coat, Tack Coat and Asphalt Joint Preparation
MS-HWY-006 — Road Marking Installation
MS-HWY-007 — Highway Signs and Gantry Installation
MS-HWY-008 — Guardrail and Concrete Safety Barrier Installation
MS-HWY-009 — Box Culvert Construction
MS-HWY-010 — Traffic Management and Temporary Diversion
MS-BRI-006 — Cofferdam and In-Water Foundation Works
MS-BRI-007 — Bridge Prestressing and Tendon Grouting
MS-BRI-008 — Cast-In-Situ Box Girder and Form Traveller
MS-BRI-009 — Segmental Erection Using Launching Girder
MS-BRI-010 — Bridge Parapet and Vehicle Barrier
MS-BRI-011 — Bridge Deck Waterproofing and Asphalt Surfacing
MS-BRI-012 — Bridge Drainage System
MS-BRI-013 — Bridge Load Testing and Structural Monitoring
MS-SRS-001 — Contiguous Bored-Pile Retaining Wall
MS-SRS-002 — Secant Bored-Pile Retaining Wall
MS-SRS-003 — Sheet-Pile Retaining Wall
MS-SRS-004 — Soldier-Pile and Lagging Retaining Wall
MS-SRS-005 — Prestressed Ground Anchor and Tieback Installation
MS-SRS-006 — Retaining-Wall Capping Beam Construction
MS-SRS-007 — Jet-Grouted Cut-Off and Ground-Improvement Wall
MS-SRS-008 — Deep-Soil-Mixing Retaining and Cut-Off Wall
MS-SRS-009 — Retaining-Structure Instrumentation and Movement Monitoring