METHOD STATEMENT PACKAGE — TRENCHLESS AND PIPE INSTALLATION WORKS

Total method statements: 10
Total editable Microsoft Word files: 20 (10 English + 10 Bahasa Malaysia)

IMPORTANT
Every template must be reviewed and adapted by a competent project team against the contract, approved drawings, project specification, actual site conditions, approved materials, manufacturer instructions, applicable Malaysian legal requirements and the Consultant's submission procedure before use.

CONTENTS
MS-TPL-001 — Pipe-Jacking Installation
MS-TPL-002 — Slurry Microtunnelling Installation
MS-TPL-003 — Horizontal Directional Drilling
MS-TPL-004 — Horizontal Auger-Boring Pipe Crossing
MS-TPL-005 — Pneumatic Pipe-Ramming Installation
MS-TPL-006 — Trenchless Launch and Reception Shaft Construction
MS-TPL-007 — Trenchless-Pipeline Annulus Grouting
MS-TPL-008 — Pipe-Bursting Replacement of Existing Pipeline
MS-TPL-009 — Cured-in-Place Pipe Relining
MS-TPL-010 — Existing-Pipeline Sliplining